Moovehub
Landlords

EPC C by 2030: a landlord's step-by-step plan

Every rental in England and Wales must reach EPC C by 1st October 2030. Our step-by-step plan covers the cost cap, exemptions, grants and timing your next EPC.

Bailey's profile photo

Bailey

Monday, 16 November 2026•10 min read

Featured image for EPC C by 2030: a landlord's step-by-step plan

Four years sounds like plenty of time. But if your rental sits at EPC D or E today, the 1st October 2030 deadline to reach EPC C is closer than it looks once you factor in surveys, quotes, tradespeople with full diaries and tenants who need to be kept happy while the work happens.

The good news is that the rules are now clear enough to plan around. The government confirmed its approach in January 2026, and while the detail still needs secondary legislation (expected in 2027), the shape of it is settled. We covered the bigger picture of the overhaul in our guide to EPC reform for landlords. This post is the practical follow-up: what to actually do, and in what order.

The rules in a nutshell

Before the steps, a quick recap of what you are working towards:

  • The standard: every privately rented home in England and Wales covered by the minimum energy efficiency rules must reach EPC C (or have a valid exemption) by 1st October 2030. This applies to existing tenancies as well as new ones. The earlier idea of a 2028 deadline for new tenancies has been dropped.
  • The cost cap: you will not be required to spend more than £10,000 per property. For homes worth less than £100,000, the cap is 10% of the property's value instead.
  • The spending window: qualifying work carried out from 1st October 2025 counts towards the cap, so anything you have already done this year may help.
  • The penalty: councils will be able to fine up to £30,000 per property, per breach, according to the government's consultation response.

Short-term holiday lets are outside these rules, and Scotland runs its own separate regime.

Step 1: find out where you stand

Start by looking up the current EPC for each of your rentals on the government's EPC register. Note the rating, the score within that band, the date it was issued and the recommendations listed on the certificate. If you need a refresher on how the ratings work, our EPC explainer walks through it.

A property scoring 68 (a high D) is a very different project to one scoring 40 (a low E). The first might need little more than loft insulation and LED lighting. The second could need wall insulation, new windows and a heating upgrade.

If your certificate is several years old, the recommendations may be out of date. Any improvements you have made since will not be reflected, so it is often worth getting a fresh assessment before you spend a penny.

Step 2: understand the timing trick

This is the part many landlords miss, and it could save you a lot of money.

New style EPCs, calculated using the government's Home Energy Model, are due to launch in the second half of 2027. They will rate homes on several measures, including fabric performance (how well the building holds its heat) and either the heating system or smart readiness, such as solar panels and batteries.

However, the government has confirmed that any property rated C or above on the current system before 1st October 2029 will be treated as compliant until that certificate expires or is replaced. EPCs last 10 years, so a C achieved in, say, 2028 could keep you compliant well into the late 2030s.

In practical terms, that means:

  • If you are close to a C now, it makes sense to do the work and get a new certificate sooner rather than later
  • Do not commission a new EPC for no reason once the new system arrives, as a new style certificate would replace your existing C
  • Keep your certificate somewhere safe and diarise its expiry date

Step 3: get a proper plan, not just a certificate

The recommendations on a standard EPC are a starting point, but they are generic. For properties that are a long way from C, a retrofit assessment from a qualified assessor gives you a costed, prioritised list of measures specific to the building.

The government is encouraging a "fabric first" approach, which simply means stopping heat escaping before you worry about how it is produced. That usually means tackling things in roughly this order:

  1. Loft and roof insulation
  2. Draught proofing, including doors, floors and chimneys
  3. Cavity wall insulation, where the walls are suitable
  4. Better windows, or secondary glazing where full replacement is not possible
  5. Heating controls and an efficient boiler or heat pump
  6. Solar panels and battery storage

The cost of EPC assessments and some specialist retrofit advice can count towards the £10,000 cap, so a proper survey is not money wasted.

Step 4: look for free money first

Before you pay for anything, check what funding is available. The government's Warm Homes Plan includes the Warm Homes: Local Grant, run by councils, which can fully fund improvements for homes where tenants are on low incomes or certain benefits. Eligibility depends on your area and your tenant's circumstances, so speak to your council.

The Boiler Upgrade Scheme offers a grant towards a heat pump. Note that this is the one source of third-party funding that does not count towards your cost cap, whereas most other grants do.

Low-interest loans for landlords have also been proposed, though details were still pending at the time of writing.

Step 5: plan the work around your tenants

Most improvements can be done with tenants in place, but nobody enjoys a loft being emptied or windows being replaced in January. A little thought goes a long way:

  • Give plenty of notice: written notice of at least 24 hours is the legal minimum for access, but a few weeks' warning and a clear timetable will keep goodwill intact
  • Use void periods: if a tenancy is ending anyway, that is the ideal time for disruptive work like internal wall insulation
  • Talk about the benefits: lower energy bills and a warmer home are a genuine selling point, and tenants are usually supportive once they understand that
  • Smart meters: tenants who pay their own bills can ask their supplier for a free smart meter, which helps with the smart readiness measure. If a tenant refuses consent for works, you may be able to register a third-party consent exemption

It is also worth combining energy work with any other jobs on the list. Damp, mould and ventilation issues, for example, often overlap with insulation work, and our guide to black mould for landlords explains why getting ventilation right matters once a home is better sealed.

Step 6: keep every receipt

If you spend up to the cap and still cannot reach C, you can register a cost cap exemption, which will last 10 years. To do that, you need evidence. Keep invoices, quotes, before and after EPCs and photographs in one place for each property.

The main exemptions under the new rules will include:

  • Cost cap: you have spent the maximum and the property is still below C
  • Property value adjustment: the affordability exemption for lower value homes
  • High cost: even the cheapest recommended measure would cost more than the cap
  • Solid wall insulation: where it is not suitable for the property
  • Negative impacts: where work would damage the building or reduce its value
  • Third-party consent: where a tenant, freeholder, lender or planning authority will not give permission
  • New landlord: a six-month grace period after you buy a let property

Exemptions must be registered on the PRS Exemptions Register, and giving false information there can lead to a separate fine.

Step 7: decide whether the numbers still work

For most landlords, the average spend is expected to be well within the cap. The government's own impact assessment estimates around £5,400 per property. For some, though, an older, hard to treat property combined with this year's tax changes for landlords may prompt a rethink.

If you are weighing up whether to improve or sell, it is worth running both sets of numbers honestly. Factor in capital gains tax on selling a buy-to-let, the likely rent uplift from a more efficient home and how buyers are likely to value a property with a poor rating as 2030 approaches.

Your next move

Pull up your EPCs this week, sort your properties by how far they are from a C and start with the easiest wins. Spreading the work over the next few years is far kinder on your cash flow, and your stress levels, than a mad dash in 2030. It sits alongside the rest of your landlord safety certificates and checks, so it is worth adding the EPC expiry date to the same calendar.

If you would rather someone else kept track of certificates, contractors and deadlines, our fully managed service handles compliance for you. If you are planning work during a void and need a new tenant afterwards, our tenant find service can help you market the property, and its shiny new rating. And if you decide the time is right to sell, you can sell your home with Moovehub for a flat fee.

Bailey's profile photo

Written by

Bailey

Senior Treats Analyst · Updated Tuesday, 17 November 2026

Share this guide

Klarna Payment Badge

© 2026 Moove House Limited

Registered in England and Wales no. 15458312

3 The Studios, 320 Chorley Old Road, Bolton, BL1 4JU